MVR19 Real estate
development
Request the pack
The existing MVR 19 building on Mavromataion Street, Patras, photographed from the street before works
The building · Mavromataion Street · South Patras

The building today and its two concepts

MVR 19 is an existing four-storey building (ground floor and three upper floors) on Mavromataion Street, in the Psachou and Zarouchleika quarter of south Patras. The whole building is offered as it stands, for either of two concept designs: Concept A, 19 studios, or Concept B, 7 apartments. The change-of-use permitting act has not been issued.

Photo: the building today, before worksStatus as of 28 September 2026Sources last checked 28 September 2026General information, not legal advice

The building today

What exists, and what is only designed

The building stands today; both concepts exist only as concept designs. This page keeps them apart: the building as it is first, then Concept A and Concept B with their schedules and plans, then the items that are still unknown.

Building
Existing, ground floor and three upper floors
Address
Mavromataion Street, south Patras; house number on request
Offered
The whole building, as it stands
Concept designs
Two, complete: A, 19 studios; B, 7 apartments
Main-use area
A: 412.40 m² · B: 428.74 m²
Permitting act
Not issued; in preparation
Storage rooms
Planned in both; under verification
Method of sale
Offers invited; no guide price

Offered by TPL S.A., the developer of MVR 19. Title documents (deed, KAEK, cadastre extract, encumbrance certificates) will be provided in the data room. Who is selling.

The existing MVR 19 building seen from above the street, before works
The existing wraparound balcony of MVR 19, with a view over Patras, before works

The building today, before works: the street front from above, and the wraparound balcony. Current-state photographs; dates to be confirmed.

Status

Where the project stands

As of 28 September 2026. The unit-sales plan for Concept B targets completion in Q4 2027 (an estimate; see the unit-sales timeline); a buyer of the whole building sets its own programme. This timeline is updated when a stage changes.

  1. Concept designs Complete

    Two concept designs are complete, each with plans per floor, furnished layouts, an area schedule and renders: Concept A, 19 studios, and Concept B, 7 apartments. Neither is architect-signed.

  2. Change-of-use permitting act Not issued

    In preparation. For the €250,000 route the act must be issued on or after 5 April 2024; an act issued earlier counts only if updated or revised on or after that date.

  3. Works To follow

    The conversion works follow the permitting act; in a sale as it stands, they are the buyer's, for the concept the buyer chooses.

  4. Completion Target Q4 2027 (unit sales)

    The unit-sales plan for Concept B targets Q4 2027, an estimate, not guaranteed. The change of use must be completed before any end buyer of a unit applies. The resale route.

Dates can change. Dates are estimates and can change, in particular because of the extremely high demand for construction workers in Greece.

In a sale of the building as it stands, the buyer obtains the permitting act and carries out the works; what preparatory work done so far passes with the building is agreed in writing.

Drone photograph of the existing MVR 19 building in its south Patras neighbourhood
The building in its neighbourhood, photographed as it stands. Open the location in Google Maps.
Location

South Patras, between the port and the city centre

Mavromataion Street lies in the Psachou and Zarouchleika quarter, a dense residential area of apartment blocks in the south of Patras, Greece's third-largest city. The house number is given on request.

~1kmPatras Port passenger terminalStraight line; 1.8 km on foot
~2kmCity centreAbout 30 minutes on foot
1.5kmSt Andrew General Hospital465 beds, about 1,000 staff
~2.2kmKoukouli campusAbout 29 minutes on foot

Patras market and demand

Distances and transport

How far the building is from what matters

The main University of Patras campus at Rio is not walkable: it is 9.4 km by road. The port, St Andrew General Hospital and the Koukouli campus are.

Distances from Mavromataion Street, measured 27 September 2026.
DestinationDistanceTime or note
Patras Port passenger terminalAbout 1 km straight line; 1.8 km on footFerries to Ancona, Bari, Brindisi and Venice; daily ferry to Sami (Kefalonia) and Ithaca
City centreAbout 2 kmAbout 30 minutes on foot
St Andrew General Hospital1.5 km465 beds, about 1,000 staff
South ParkAbout 1.6 km on foot
Koukouli university campusAbout 2.2 kmAbout 29 minutes on foot
Patra MallAbout 3.4 km
University of Patras main campus, Rio9.4 km by roadAbout 13 minutes by car; 45–60 minutes by public transport (our estimate)
University General Hospital, Rio10.7 km
Suburban railLine 1 Antheias stop about 1.4 km; Agios Andreas station about 1.8 km on footLine 2 Agios Andreas–Rio, 14 minutes, about hourly
Araxos AirportAbout 39 kmSeasonal, May–October
Kyllini port73 km
Athens centreAbout 215 kmAbout 2 h 40 by road; the Olympia Odos motorway connects Patras with Athens
Athens International AirportAbout 244 kmAbout 2 h 50 by road

How we measured. Measured from the street centre (38.2286 N, 21.7331 E) by OSRM routing on OpenStreetMap, 27 September 2026; to be re-measured from the building door. There is no through train to Athens today; the new line's Psathopyrgos terminus targets Q2 2027 and Rio Q4 2028. These are targets, not dates.

Photographs

As it stands, before works

MVR 19 is the conversion of an existing building, not a new build. These photographs show it as it stands on Mavromataion Street, before works.

The street front, the block from above and the roof are shown as they are. Dates of the current-state photographs are to be confirmed.

Interiors today

The existing floors are open rooms with balconies and built-in wardrobes; on the corner, a wraparound balcony. Either concept rebuilds the interiors: Concept A divides each floor into studios, and Concept B replans the floors as seven apartments. These photographs show the light, the balconies and the outlook, not the finished rooms.

From the roof

The view from the existing roof

Panoramas photographed from the existing roof look over south Patras to the mountains and the sea.

Drag or scroll sideways to look around. On a keyboard, focus the panorama and use the left and right arrow keys. Photographed from the existing roof before works.

What it could become

Two concepts, one building

The same building has two complete concept designs. Concept A divides it into 19 studios; Concept B makes it 7 apartments of one to three bedrooms, with a penthouse on the 3rd floor. A buyer of the whole building chooses which to take to the permitting act.

Compare side by side

The exterior, in both concepts

The exterior renders are shared by the two concept designs. They show design intent only; the roof garden is shared in Concept A and goes with the penthouse in Concept B.

Concept render of the renovated facade on Mavromataion Street The existing building on Mavromataion Street, before works TodayConcept render

Left: the building today, before works, photographed from the street corner. Right: illustrative concept render of the street front. The two views are framed differently.

Illustrative concept render. Not an architectural drawing and not the building today.

Concept A

Concept A: 19 studios

19 self-contained studios, 5 + 5 + 5 + 4 on four floors; 412.40 m² of main-use area (ground 99.68, 1st 112.95, 2nd 112.95, 3rd 86.82 m²); 16.29 to 27.64 m² per studio; average 21.71 m². From the April and July 2026 concept design.

Main-use areas exclude balconies, terraces, common areas and storage; the architect-signed schedule is pending. Concept A is no longer offered studio by studio on the unit-sales site; it is available only with the whole building.

19studios, 19 separate purchases
412.40m²main-use area
21.71m²average studio
5+5+5+4studios per floor
Concept A · Unit mix

Four size bands, one building

Four compact studios of 16–19 m², eight studios of 19–22 m², five large studios of 22–25 m² and two of 27.64 m².

The largest studio is 1.7 times the smallest. In the concept design every studio is self-contained, with its own kitchenette and shower room.

Concept A unit mix by size band, as of 28 September 2026. Main-use areas from the concept design's schedule.
BandRangeStudiosCountBand m²
Compact studio16–19 m²GF4, GF5, A1, B1472.68
Studio19–22 m²GF2, GF3, A2, A5, B2, B5, C2, C38166.17
Large studio22–25 m²GF1, A4, B4, C1, C45118.27
Largest studio27.64 m²A3, B3255.28
Total16.29–27.64 m²4 floors19412.40
Concept A · Unit schedule

All 19 studios, unit by unit

The studio schedule of Concept A. The studios are not sold one by one; they are shown here as the design a buyer of the whole building would take forward.

Concept A unit schedule as of 28 September 2026. Areas are the concept design's main-use schedule, to be confirmed in architect-signed drawings. The labels on six units differ between the deck plans and this schedule; the schedule governs.
UnitFloorMain-use area m²SizeStatus
GF1 Ground floor 24.15 Large studio With the building
GF2 Ground floor 20.01 Studio With the building
GF3 Ground floor 20.52 Studio With the building
GF4 Ground floor 18.71 Compact studio With the building
GF5 Ground floor 16.29 Compact studio With the building
A1 1st floor 18.84 Compact studio With the building
A2 1st floor 21.29 Studio With the building
A3 1st floor 27.64 Largest studio With the building
A4 1st floor 24.56 Large studio With the building
A5 1st floor 20.62 Studio With the building
B1 2nd floor 18.84 Compact studio With the building
B2 2nd floor 21.29 Studio With the building
B3 2nd floor 27.64 Largest studio With the building
B4 2nd floor 24.56 Large studio With the building
B5 2nd floor 20.62 Studio With the building
C1 3rd floor 22.73 Large studio With the building
C2 3rd floor 19.90 Studio With the building
C3 3rd floor 21.92 Studio With the building
C4 3rd floor 22.27 Large studio With the building
19 studios4 floors412.40average 21.71 m²Only with the whole building

The 9 storage rooms of Concept A's project brief are not in this schedule; see features and their confidence.

Concept A · Floor plans

Concept A plans, floor by floor

Furnished concept plans, illustrative; areas from the concept design's main-use schedule, to be confirmed in architect-signed drawings.

Concept A: furnished 3D floor plan of the MVR 19 ground floor: studios GF1 to GF5
Concept A: furnished concept plan of the ground floor, illustrative. Areas are the main-use schedule of the concept design, to be confirmed in architect-signed drawings.

Ground floor: 5 studios, 99.68 m²

GF124.15 m²With the buildingLarge studio
GF220.01 m²With the buildingStudio
GF320.52 m²With the buildingStudio
GF418.71 m²With the buildingCompact studio
GF516.29 m²With the buildingCompact studio

Concept design: ARCHRAY Architects · architect Konstantinos Kotsalidis.

Area keys from the concept design

The area key of each floor, as drawn in the Concept A design. Six unit labels on these keys differ from the unit schedule above; the schedule governs.

Concept B

Concept B: 7 apartments

Seven apartments, 2 + 2 + 2 + 1 on four floors: 428.74 m² of main-use area, 40.72 to 91.16 m², one to three bedrooms. The whole 3rd floor is the penthouse C1, with the roof garden above it; each apartment has a storage room in the basement. From the January 2026 concept design.

The same scheme is offered apartment by apartment on the unit-sales site. Its sizes are in line with the 40–89 m² units that other €250,000 conversions in Patras offer. Areas are the concept deck's main-use figures, as provided, not architect-signed.

Concept B render of the two-bedroom apartment B2: living room seen from the kitchen corner, sofa and balcony window
Living room of apartment B2. Illustrative concept render (residence B2).
7apartments, 7 separate purchases
428.74m²main-use area
12bedrooms in all
91.16m²the penthouse C1
Concept B · Apartment schedule

All 7 apartments, one by one

5 of 7 apartments are available today. The apartments are also offered one by one on the unit-sales site; the whole building is offered only until the first of them is sold, and then the whole-building offer closes for good. Apartment links open each apartment's page there.

Concept B apartment schedule as of 28 September 2026. Areas are the concept deck's main-use figures in m², as provided, not architect-signed. Storage areas are approximate: the deck's basement key prints slightly different figures. Once an apartment is sold to an end buyer, the whole-building offer closes for good.
ApartmentFloorArea m²BedsBathsStorage roomOutdoorStatus
C1Penthouse 3rd floor 91.16 3 2 No. 2, about 15.14 m² Terrace and the roof garden (per the concept design) Reservations open
B1 2nd floor 47.99 1 1 No. 4, about 13.47 m² Balcony Reservations open
B2 2nd floor 70.03 2 1 No. 1, about 13.47 m² Balcony Reservations open
A1 1st floor 47.99 1 1 No. 6, about 12.95 m² Balcony Reserved
A2 1st floor 70.03 2 1 No. 3, about 12.58 m² Balcony Reservations open
GF1 Ground floor 40.72 1 1 No. 5, about 11.70 m² None Reservations open
GF2 Ground floor 60.82 2 1 No. 7, about 9.04 m² None Reserved
7 apartments4 floors428.741287 rooms, about 88.35 m²4 balconies, terrace, roof garden5 available

The storage rooms and the roof garden's allocation to the penthouse follow the concept design; both need a new horizontal-property deed (see documents).

Concept B · Floor plans

Concept B plans, floor by floor

Furnished concept plans with the area key of each floor, and the basement with its seven storage rooms. Select a floor; select a plan to enlarge it.

Concept B (seven apartments) for MVR 19: furnished ground-floor plan, apartments GF1 and GF2
Ground floor plan, concept design; the furnished layout is illustrative. Areas as provided in the concept, not architect-signed.

Ground floor2 apartments · 101.54 m²

Concept B (seven apartments) for MVR 19: ground-floor area key, GF1 40.72 m² and GF2 60.82 m²
Key to the apartments on this floor.

Concept design: ARCHRAY Architects · architect Konstantinos Kotsalidis.

Concept B · Interiors

Inside a two-bedroom apartment

The concept deck's interior renders all show the two-bedroom plan of apartment B2 (70.03 m²) on the 2nd floor; A2 below it has the same layout. They show design intent, not a specification.

Walk through B2

Illustrative concept render (residence B2). Concept design: ARCHRAY Architects · architect Konstantinos Kotsalidis. Every interior render shows apartment B2; the other apartments have their own plans. The unit-sales site's walk-through places all 14 renders on the B2 plan.

Features

Features and how sure we are of them

Each feature is listed for both concepts with the evidence behind it today. None is architect-signed.

Features of the two concept designs and their confidence, as of 28 September 2026.
FeatureStatusConcept A: 19 studiosConcept B: 7 apartments
RoomsConcept plans onlyEach studio self-contained, with its own kitchenette and a private shower room with WC.Three one-bedroom and three two-bedroom apartments with one bathroom each; the penthouse C1 has three bedrooms and two bathrooms.
Roof gardenConcept render onlyA shared roof garden with a pergola.Allocated to the penthouse C1 in the concept design; the allocation must be fixed in a new horizontal-property deed.
Balconies and terracesAllocation not fixedBalconies on the upper floors and terraces on the 3rd floor; whether each is private or common is not yet fixed.Balconies on the upper floors; terraces on the 3rd-floor plan with the penthouse. Not yet fixed in a deed.
Storage roomsUnder verificationThe project brief provides for 9 storage rooms. They are not shown on the concept drawings.7 storage rooms, one per apartment, about 9 to 15 m² each, on the concept's basement plan.
LiftUnder verificationBoth concepts' plans show a lift beside the stair; Concept B's schedule gives lift access to the upper floors. Whether the lift exists today or is part of the works is to be confirmed.
ViewsPhotographedPanoramas photographed from the existing roof look over south Patras to the mountains and the sea.

Storage rooms in either concept need the one registered basement store to be divided; their existence, sizes and cadastral codes are under verification.

Building documents

What is on file, and what is not

The documents that concern the building itself, with their status as of 28 September 2026. Documents are provided in due diligence as they are issued.

Full document index
Building documents and their status, as of 28 September 2026.
DocumentStatus
Concept designs A and B: plans per floor, furnished layouts, area schedules, renders, 360° viewsAvailable concepts; not architect-signed
Current-state photographs (exterior, interiors, roof)Available
Title deed, KAEK, cadastre extract, encumbrance and claims certificatesNot yet available
Existing building permit(s); evidence of legal use on 5 April 2024Under verification
Change-of-use permitting act (issued on or after 5 April 2024)Not issued in preparation
Horizontal-property deed for the chosen concept. Concept A: 19 units and the storage rooms, each with its own KAEK. Concept B: the seven apartments kept; the basement store divided into storage rooms and the roof garden allocatedNot yet constituted
Architect-signed drawings and area scheduleNot yet available
Energy performance certificate (building as it stands)Not yet available
Structural and seismic assessment; year of construction; utilitiesNot yet commissioned
Leases and occupancyUnder verification

Concept A and the title

Concept A replaces the building's seven registered apartments with 19 new units. It needs a new horizontal-property deed for the 19 units and the storage rooms, each with its own KAEK, after the change of use.

Concept B and the title

Concept B keeps the building's existing division into seven apartments, so no division into 19 new units is needed; the change of use, a new horizontal-property deed for the storage rooms and the permits are still required.

Legal use on 5 April 2024. The intended conversion is from non-residential to residential use. The building's legal use on 5 April 2024 is under verification and will be evidenced in the data room (building permit and cadastre record). If any part of the building was residential in legal use on 5 April 2024, that part cannot use the €250,000 route (Circular 1/2026, Clarification 5).

Still unknown

What we cannot tell you yet

A buyer of the whole building will ask these questions first. Today each answer is unknown in our records or under verification; each is to be confirmed in due diligence.

We publish the list so that no one prices the building on an assumption we have not checked. Your own lawyer, engineer and tax adviser should test every item, for the concept you would take forward. How due diligence would run.

  • The exact house number and postcode: given on request, to be confirmed in due diligence.
  • The year of construction: unknown in our records.
  • A structural and seismic assessment: not yet commissioned.
  • The legal use on 5 April 2024 and the existing building permit: under verification.
  • The permitting route (permit revision, small-scale works approval or file update) and its date: not yet set; the act is in preparation.
  • The horizontal-property deed for the chosen concept, and a separate KAEK for each new unit or storage room: not yet constituted.
  • For Concept A, whether dwellings of 16 to 28 m² meet the Building Regulation: to be confirmed by the architect.
  • Whether the lift exists today or is part of the works, and which floors it serves: to be confirmed.
  • Any parking requirement for the new dwellings, or payment in lieu: unknown in our records.
  • Utilities and separate meters for each unit: unknown in our records.
  • Current occupancy and any leases: under verification.
  • Planning context: Law 5322/2026 amended article 199 of the Spatial Planning Code so that offices, shops and warehouses in legally existing buildings may convert to dwellings regardless of land-use zoning, within conditions. Its application to MVR 19 has not been assessed.
Next step

Request the information pack

Offers are invited for the building as it stands, for either concept. No guide price is published. Other structures can be discussed. We reply within one business day, in English or Greek, and site visits in Patras are by appointment.

Subject to contract, due diligence and a notarial deed.